Hampton Roads District Weekly Traffic Alert: Aug. 30-Sept. 5, 2026
All work is scheduled weather permitting. Updated information on work zones and lane closures is available on 511.vdot.virginia.gov.
/prod01/vdot-cdn-pxl/media/vdotvirginiagov/news-and-events/news/bristol/2024/Road-Work-Ahead.jpg)
NOTE: This list covers full closures of interstates, ramps, bridges and primary roads, and lane closures at the bridge-tunnels and the Berkley, Coleman, High Rise and James River bridges.
** VDOT will suspend many highway work zones and lift most lane closures on interstates and other major roads in Virginia for holiday travel from noon, Friday, Sept. 4 until noon, Tuesday, Sept. 8.**
Scheduled closures are subject to change based on weather conditions and other factors.
For information on the many other lane closures necessary for maintenance and construction throughout Hampton Roads, visit 511 Virginia (511.vdot.virginia.gov), download the VDOT 511 smartphone app, or dial 511.
Bridges and tunnels
Hampton Roads Bridge-Tunnel, I-64:
- Alternating, mobile, single-lane closures in both directions Aug. 30 from 9 p.m. to 5 a.m.
-
Alternating, single-lane closures from 9 p.m. to 5 a.m.:
- In both directions Aug. 31-Sept. 1
- Eastbound Sept. 2-3
Hampton Roads Bridge-Tunnel (HRBT) Expansion Project:
- Single-lane closures on I-64 in both directions at the HRBT Aug. 30-Sept. 3 from as early as 8 p.m. to 5 a.m.
-
Single-lane closures on I-64 in both directions Aug. 30-Sept. 3 from as early as 8 p.m. to 5 a.m.:
- at Mallory Street Bridge
- from Willoughby Bay Bridge to Granby Street
- A series of intermittent stoppages on I-64 in both directions between Patrol Road and Mallory Street (exit 268) Aug. 30-Sept. 4 from 10 p.m. to 5 a.m.
-
Full ramp closures from as early as 8 p.m. to 5 a.m.:
- I-64 west off-ramp to W. Bay Avenue (exit 274) Aug. 30-Sept. 3
- I-64 east on- and off-ramps at Mallory Street (exit 268) Aug. 31-Sept. 2
- I-64 west on- and off-ramps at Mallory Street (exit 268) Sept. 1-2
- W. Bay Avenue on-ramp to I-64 east Aug. 30-Sept. 3
- 4th View Street on-ramp to I-64 west Aug. 31-Sept. 3
- Long-term, continuous closure on Mason Creek Road in both directions at I-64
Monitor-Merrimac Memorial Bridge-Tunnel, I-664:
- Alternating, single-lane closures in both directions Aug. 31-Sept. 3 from 9 p.m. to 5 a.m.
- Alternating, mobile, single-lane closures southbound on Sept. 1 from 9-10 a.m.
James River Bridge, Route 17:
- Single-lane closures in both directions Aug. 31-Sept. 3 from 9 a.m. to as late as 3 p.m.
George P. Coleman Bridge, Route 17:
- Alternating, mobile, single-lane closures in both directions Sept. 1-3 from 9 a.m. to 3 p.m.
Berkley Bridge, I-264:
- Full off-ramp closures from I-264 west to Berkley Avenue (exit 8) Sept. 1-2 from 8 p.m. to 5 a.m.
- Single-lane closure westbound Sept. 3 from 7 p.m. to 5 a.m.
Elizabeth River Crossings (Downtown/Midtown Tunnels):
- Go to DriveERC.com for scheduled closures on the Downtown Tunnel (I-264), Midtown Tunnel (Route 58) and MLK Expressway (Route 164).
Interstates
I-64, Hampton:
- Full on-ramp closure from Armistead Road to I-64 west Aug. 30-Sept. 3 from 8 p.m. to 5 a.m.
I-64, Chesapeake:
-
Full ramp closures from I-64 east to I-464 north (exit 291A):
- Aug. 30 from 12:01 a.m. to 8 a.m. and from 10 p.m. to 5 a.m.
- Aug. 31-Sept. 3 from as early as 11 p.m. to as late as 5 a.m.
- Full ramp closures from I-64 east to I-464 south (exit 291B) Aug. 30-Sept. 3 from as early as 11 p.m. to as late as 5 a.m.
- Full ramp closures from I-64 west to I-464 north (exit 291A) Aug. 31-Sept. 3 from as early as 8 p.m. to as late as 5 a.m.
I-64, Gap Widening Segment C, James City County:
- Single-lane closures on I-64 in both directions from the New Kent County-James City County line to Route 199/Lightfoot (exit 234) Aug. 31-Sept. 3 from as early as 7 p.m. to as late as 5 a.m.
I-64, Hampton Roads Express Lanes (HREL):
- The Hampton Roads Express Lanes project website contains additional information on the express lanes project-related closures and traffic impacts. (vdot.virginia.gov/projects/major-projects/64expresslanes/news--traffic-alerts/)
- An interactive map displaying long-term traffic impacts across the various Hampton Roads Express Lanes construction projects can be found at the project website. (vdot.virginia.gov/projects/major-projects/64expresslanes/long-term-traffic-impacts/)
I-64, Norfolk Reversible Express Lanes:
- Full closure in both directions:
- Continuously from 8 p.m. Aug. 28 until 3 a.m. Aug. 31
- Aug. 30-Sept. 3 from 8 p.m. to 3 a.m.
- Aug. 31-Sept. 4 from 9:30 a.m. to as late as 12:30 p.m.
I-64, Chesapeake Express Lanes:
- Full Express Lanes closures westbound between the High Rise Bridge and Greenbrier Parkway (exit 289) Aug. 30-Sept. 3 from as early as 8 p.m. to as late as 9 a.m.
I-64, HREL Hampton 4C Project:
- Traffic shift on I-64 east at the Hampton River bridges with all traffic moved to the new eastbound bridges, as early as Sept. 2.
-
Full ramp closures on I-64 Aug. 30-Sept. 3 from as early as 9 p.m. to 5 a.m. (Non-conflicting ramp closures may be in place concurrently):
- Off-ramp from I-64 west to Armistead Avenue/LaSalle Avenue (exit 265B)
- Off-ramp from I-64 east to Rip Rap Road, Armistead Avenue/Langley AFB (exit 265C)
- On-ramp from Settlers Landing Road/Woodland Road to I-64 west
- Off-ramp from I-64 east to Settlers Landing Road/Woodland Road (exit 267)
- On-ramp from Settlers Landing Road/Woodland Road to I-64 east
- Off ramp from I-64 WB to Settler's Landing Road/Woodland Road (exit 267)
- Alternating, single-lane closures on I-64 in both directions from Mallory Street (exit 268) to LaSalle Avenue (exit 265) Aug. 30-Sept. 3 from 10 p.m. to 5 a.m.
- Brief, intermittent stoppages on I-64 in both directions between Mallory Street (exit 268) and LaSalle Avenue (exit 265) Aug. 31-Sept. 4 between 12:01 a.m. and 4 a.m.
- Long-term, single-lane closure on the off–ramp from I-64 east to Settlers Landing Road/Woodland Road (exit 267), until as early as Aug. 31 with details in the full traffic alert.
- Long-term, continuous single-lane closure on I-64 in both directions, reducing travel lanes from three to two lanes between Settlers Landing Road/Woodland Road (exit 267) and LaSalle Avenue (exit 265A).
- Long-term traffic shift of I-64 in both directions at the Hampton River bridges with all traffic moved to the reopened westbound bridge, with details in the full traffic alert.
- Long-term traffic shift with a new stop sign on I-64 west off-ramp at Armistead Avenue/LaSalle Avenue (exit 265B) and lane reduction on North Armistead Avenue at Thomas Street.
I-64, HREL Norfolk 1A Project:
- Alternating single-lane closures on I-64 in both directions from Granby Street (exit 276) to Chesapeake Boulevard (exit 278) continuously from as early as 7 p.m. Aug. 28 to 5 a.m. Aug. 31. (No eastbound work on Aug. 30 between 11 a.m. and 3 p.m.)
- Brief, intermittent stoppages along I-64 east between Little Creek Road (exit 276) to Tidewater Drive (exit 277A) Aug. 30-Sept. 3 from as early as 10 p.m. to 5 a.m.
- Brief, intermittent stoppages along I-64 west between Tidewater Drive (exit 277A) to Little Creek Road (exit 276C) Aug. 30-Sept. 3 from as early as 10 p.m. to 5 a.m.
-
Alternating single-lane closures on I-564 from I-64 to Terminal Boulevard:
- Eastbound Aug. 30-Sept. 3 from as early as 7 p.m. to 3 p.m.
- Westbound Aug. 30-Sept. 3 from as early as 9 a.m. to 4a.m.
- Full ramp closures from I-564 east to I-64 west Aug. 3-Sept. 3 from 8 p.m. to 5 a.m.
- Full off-ramp closures from I-64 west to I-564 west (exit 276B) Aug. 30-Sept. 3 from 10 p.m. to 4 a.m.
- Full on-ramp closures from Patrol Road to I-64 east Aug. 30-Sept. 3 from as early as 9 p.m. to 5 a.m.
- Full off-ramp closures from I-64 west to Granby Street (exit 276A) Aug. 30-Sept. 3 from as early as 8 p.m. to 5 a.m.
- Full on- and off-ramp closures from I-64 east to Granby Street/I-564 west (exit 276A) Aug. 30-Sept. 3 from as early as 9 p.m. to 4 a.m.
- Full off-ramp closures from I-564 east to Little Creek Road Aug. 30-Sept. 3 from 7 p.m. to 5 a.m.
- Full off-ramp closures from I-64 west to Little Creek Road (exit 276C) Aug. 30-Sept. 3 from as early as 10 p.m. to 5 a.m.
- Full on-ramp closures from Little Creek Road to I-64 east Aug. 30-Sept. 3 from as early as 10 p.m. to 5 a.m.
- Full on- and off-ramp closures on I-64 east and west at Tidewater Drive (exits 277A and 277B) Aug. 30-Sept. 3 from as early as 8 p.m. to 5 a.m.
- Single-lane closures on I-64 east on the Willoughby Bay bridge from 15th View Street (exit 272) to 4th View Street (exit 273) Aug. 30-Sept. 3 from as early as 9 p.m. to 5 a.m.
- Alternating lane closures on southbound Granby Street between Patrol Road and the I-564 overpasses Aug. 30-31 from 8 p.m. to 5 a.m.
- Alternating single-lane closures on I-64 in both directions from Granby Street (exit 276) to Chesapeake Boulevard (exit 278) Aug. 31-Sept. 3 from as early as 7 p.m. to 5 a.m.
- Reopening of single-lane closure and removal of the long-term traffic split on I-64 east at Tidewater Drive (exits 277A and 277B), as early as Aug. 28, with details in the full traffic alert.
- Long-term traffic shift on I-564 east off-ramp to Little Creek Road (exit 4) and lane reduction on westbound East Admiral Taussig Boulevard.
- Long-term full on-ramp closure from northbound Tidewater Drive to I-64 west with detour to next left-turn lane onto on-ramp to I-64 west.
- Long-term full on-ramp closure from southbound Tidewater Drive to I-64 east with new left turn at Thole Street to access I-64 east.
- Long-term traffic pattern on I-64 west between Tidewater Drive (exit 277) and Patrol Road in Norfolk with one mainline lane closed and new left exit and temporary lane open alongside the Norfolk Reversible Roadway. Visit webpage for more information on this temporary traffic pattern.
I-64, HREL Newport News/Hampton 4A/4B Project:
I-464, Chesapeake:
- Full on-ramp closures from I-464 south to I-64 east (exit 1B) Aug. 31-Sept. 3 from 8 p.m. to 5 a.m.
-
Full on-ramp closures from Route 17 (Dominion Boulevard) north to I-464 north (exit 17B):
- Continuously from 5 a.m. Aug. 30 to 5 a.m. Aug. 31
- Aug. 30-Sept. 3 from 8 p.m. to 5 a.m.
- Aug. 31-Sept. 4 from 9:30 a.m. to as late as 3 p.m.
I-264, Portsmouth:
I-264, Virginia Beach:
-
Full on- and off-ramp closures Aug. 30-Sept. 3 from as early as 8 p.m. to 5 a.m.:
- I-264 west at Independence Boulevard south (exit 17A)
- I-264 west at Witchduck Road (exit 16)
I-264, Norfolk:
-
Full off-ramp closures Aug. 30-Sept. 3 from 9 p.m. to 5 a.m.:
- I-264 east to Campostella Road (exit 11)
- I-264 west to Brambleton Avenue (exit 11)
I-664, Chesapeake:
-
Full off-ramp closures from I-664 Aug. 30-Sept. 3 from 9 p.m. to 5 a.m.:
- I-664 in both directions to Portsmouth Boulevard west (exit 11A)
- I-664 in both directions to Portsmouth Boulevard east (exit 11B)
- I-664 north to Dock Landing Road (exit 12)
I-564 Intermodal Connector, Norfolk:
- Full off-ramp closures of the Intermodal Connector west ramp to Seabee Road Aug. 31-Sept. 4 from 9:30 a.m. to as late as 4:30 p.m.
Last updated: August 28, 2026
Legal Disclaimer:
EIN Presswire provides this news content "as is" without warranty of any kind. We do not accept any responsibility or liability for the accuracy, content, images, videos, licenses, completeness, legality, or reliability of the information contained in this article. If you have any complaints or copyright issues related to this article, kindly contact the author above.